PLASTIC STAIGHT SLIDE
Drill hole on the head of slide. Drill the same distance hole on pipe (measure and mark the distance before drilling). Connect them by bolts. ( Put slide down after finish this step, leave long bolts on pipes, put slide back after safety net and soft protection pipe cover complete)
GATE OF SLIDE
There are 4 long ears connector on two pillars, just bolts the gate panel to ears ( you may have to drill holes on panel by yourself). Leave about 5cm space under the panel, there will be platform there afterward.
